meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
augmented2015:start [2015/03/22 15:41]
aknutas [News & Notes]
augmented2015:start [2015/04/03 21:25]
aknutas
Line 12: Line 12:
     * Technical day slides have now available [[http://1drv.ms/1FzK50J|HERE]].     * Technical day slides have now available [[http://1drv.ms/1FzK50J|HERE]].
   * Deadlines, checkpoints and checkpoints have been updated.   * Deadlines, checkpoints and checkpoints have been updated.
-  * Virtual machine with all the course tools is being prepared for the teamsExpect download links by Monday+  * Virtual machine with all the course tools has been uploadedSetup: Ubuntu 64bit 14.10 with Android Studio with two example projects and Processing installed
-  * **Do you need access to the Innovation Factory classroom?** Mail course staff (Antti Knutas) with your username (the one you log in to email and university machines) and he'll contact the building services after he has a list of people who need access.+    [[https://filesender.funet.fi/?vid=1c50c1a3-f27e-16c9-6b0a-000060cb14ca|7zip archive, part 1]] (3.91GB, link expires 14.04.2015) 
 +    [[https://filesender.funet.fi/?vid=4e7fd83d-5ad9-c888-db5a-0000789ce922|7zip archive, part 2]] (1.6GB, link expires 14.04.2015) 
 +  * Do you need access to the Innovation Factory classroom? Mail course staff (Antti Knutas) with your username (the one you log in to email and university machines) and he'll contact the building services after he has a list of people who need access
 +  * **Reserve the first group meeting time** for your group in [[http://doodle.com/stdditdec84aka9p|HERE]].
  
 \\ \\
Line 23: Line 26:
   * //First team checkpoint// in 2nd week of April (6.4. – 10.4.)   * //First team checkpoint// in 2nd week of April (6.4. – 10.4.)
     * Project plans 100% done and program prototype ready.     * Project plans 100% done and program prototype ready.
-    * Meeting time reservation link will open later.+    * Meeting time reservation link: http://doodle.com/stdditdec84aka9p
   * //Second team checkpoint// in early May (starting with exam week 4.5.)    * //Second team checkpoint// in early May (starting with exam week 4.5.) 
     * Program 85% ready, report 25% ready and ready to tell how you are going to do the presentation.     * Program 85% ready, report 25% ready and ready to tell how you are going to do the presentation.
Line 52: Line 55:
   * Glass UI designer (for prototyping) - http://glasssim.com/   * Glass UI designer (for prototyping) - http://glasssim.com/
   * Installing Android Studio on Ubuntu Linux - http://www.webupd8.org/2014/05/install-android-studio-in-ubuntu-via-ppa.html   * Installing Android Studio on Ubuntu Linux - http://www.webupd8.org/2014/05/install-android-studio-in-ubuntu-via-ppa.html
 +
 +**Android tutorials**
 +  * Their developer site: http://developer.android.com/about/start.html
 +  * A series of tutorials: https://developer.android.com/training/index.html 
 +  * Creating the first application: https://developer.android.com/training/basics/firstapp/index.html 
 +  * Android for absolute beginners book: http://link.springer.com/book/10.1007/978-1-4842-0019-3
 +    * I found that our LUT library subscription includes also access to some books. You can download this Android PDF from the preceding address, but only from inside the LUT university network.
  
 \\ \\