meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
dotnet2013:start [2013/01/24 22:21] aknutas [Discussion and the Q&A] |
dotnet2013:start [2013/02/06 13:53] (current) aknutas [News & Notes] |
||
---|---|---|---|
Line 3: | Line 3: | ||
====== .NET Code Camp 2013 ====== | ====== .NET Code Camp 2013 ====== | ||
- | //Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2011 Room no: 6218// | + | //Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2013 Room no: 6218// |
CT30A9300 Code Camp on Communications Engineering (4 cr) | CT30A9300 Code Camp on Communications Engineering (4 cr) | ||
Line 10: | Line 10: | ||
* Course is about to start! | * Course is about to start! | ||
* Friday tutorial material {{: | * Friday tutorial material {{: | ||
+ | * Please give course feedback: [[http:// | ||
+ | * **Return requirements relating to the report have been updated.** The deadline has been extended from Friday 1.2. to Sunday 3.2. See more details below. | ||
+ | * Time reservation for group feedback on Monday 11.2. is available. Participation is mandatory. Prepare to present a verbal report of your work and discuss details of your project. Maximum time available is 30 minutes. Please reserve only one time per group. Time reservation is available at: [[http:// | ||
====== Code Camp Week ====== | ====== Code Camp Week ====== | ||
**Location** **6218** basement computer lab | **Location** **6218** basement computer lab | ||
- | * **Start time on Monday 23.1.2011 at 9:10** | + | * **Start time on Monday 23.1.2013 at 9:10** |
\\ | \\ | ||
^ | ^ | ||
Line 52: | Line 54: | ||
\\ | \\ | ||
\\ | \\ | ||
- | **Return requirements for groups and the return schedule** | + | ==== Return requirements for groups and the return schedule |
- | * On Friday you need to have | + | |
* Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.) | * Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.) | ||
* Five minute demonstration of your //working// program | * Five minute demonstration of your //working// program | ||
Line 64: | Line 66: | ||
* Tech | * Tech | ||
* Some explanatory charts optionally | * Some explanatory charts optionally | ||
- | * Your project source | + | * Your project source |
- | * In a week (before 23:59 1.2.2012) send an email to Antti Knutas ( firstname.lastname@lut.fi ) with | + | |
- | * Report | + | * Six page report |
- | * One page poster about your project (see examples from previous years) | + | * Project introduction, |
+ | * Functionality and features | ||
+ | * High points | ||
+ | * Reflection (how did your brainstorming go, how did you end up with the idea, how did you approach the developing process, how did the code camp method work for you?) | ||
+ | * Conclusion | ||
+ | * One page poster about your project (see examples from previous years, also upload to wiki) | ||
* Email has to have topic [CC2013] Group X (for example: [CC2013] Group 2) | * Email has to have topic [CC2013] Group X (for example: [CC2013] Group 2) | ||
* Include project source code (remove binaries in bin and opt!) and the project report document in the email | * Include project source code (remove binaries in bin and opt!) and the project report document in the email | ||
- | * Don't upload project source to the wiki, only the report and binaries | + | * Don't upload project source to the wiki, only the report, poster |
- | * Upload | + | * Considering uploading |
* Include link to your wiki page in the email | * Include link to your wiki page in the email | ||
- | | + | |
- | * Before March 1st sign up your team in one major Imagine Cup category (or the Windows Phone Challenge) | + | * Come to your reserved feedback time slot, which can be reserved here: [[http:// |
- | * See the details and links: | + | |
+ | * See the details and links: | ||
\\ | \\ | ||
- | \\ | ||
- | |||
- | The feedback day for the reports will be announced on week 5. Attending the feedback day and presenting your report is mandatory. | ||
- | |||
+ | The feedback day for the reports will be on the Monday 11.2. in the afternoon. Attending the feedback day and giving a verbal report is mandatory. Reserve a time for your group at: [[http:// | ||
====== Imagine Cup ====== | ====== Imagine Cup ====== | ||
* [[http:// | * [[http:// |