meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dotnet2013:start [2013/01/24 22:21]
aknutas [Discussion and the Q&A]
dotnet2013:start [2013/02/06 13:53] (current)
aknutas [News & Notes]
Line 3: Line 3:
  
 ====== .NET Code Camp 2013 ====== ====== .NET Code Camp 2013 ======
-//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2011  Room no: 6218//+//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2013  Room no: 6218//
  
 CT30A9300 Code Camp on Communications Engineering (4 cr) CT30A9300 Code Camp on Communications Engineering (4 cr)
Line 10: Line 10:
   * Course is about to start!   * Course is about to start!
   * Friday tutorial material {{:dotnet2013:dotnet_web_tutorials.zip|HERE}}   * Friday tutorial material {{:dotnet2013:dotnet_web_tutorials.zip|HERE}}
 +  * Please give course feedback: [[http://www.webropolsurveys.com/S/055CEEDF4AB021B4.par|Course Feedback, pt1]] 
 +  * **Return requirements relating to the report have been updated.** The deadline has been extended from Friday 1.2. to Sunday 3.2. See more details below. 
 +  * Time reservation for group feedback on Monday 11.2. is available. Participation is mandatory. Prepare to present a verbal report of your work and discuss details of your project. Maximum time available is 30 minutes. Please reserve only one time per group. Time reservation is available at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Code Camp Week ====== ====== Code Camp Week ======
 **Location** **6218** basement computer lab **Location** **6218** basement computer lab
-  * **Start time on Monday 23.1.2011 at 9:10**+  * **Start time on Monday 23.1.2013 at 9:10**
 \\ \\
 ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^ ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^
Line 52: Line 54:
 \\ \\
 \\ \\
-**Return requirements for groups and the return schedule** +==== Return requirements for groups and the return schedule ==== 
-  * On Friday you need to have+  * **On Friday, at the end of the course, you need to have**
     * Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.)     * Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.)
     * Five minute demonstration of your //working// program     * Five minute demonstration of your //working// program
Line 64: Line 66:
       * Tech       * Tech
       * Some explanatory charts optionally       * Some explanatory charts optionally
-      * Your project source code as a zip  +      * Your project source binaries as wiki, no need to upload source code 
-  * In a week (before 23:59 1.2.2012) send an email to Antti Knutas ( firstname.lastname@lut.fi ) with +  * **In a week (before 23:59 3.2.2012)** send an email to Antti Knutas ( firstname.lastname@lut.fi )with: 
-    * Report of your project following the format of the Imagine Cup 2013 (link TBA+    * Six page report of your project (also upload to wiki), including: 
-    * One page poster about your project (see examples from previous years)+      * Project introduction, motivation (justify the need for your app!) 
 +      * Functionality and features 
 +      * High points of your technical design 
 +      * Reflection (how did your brainstorming go, how did you end up with the idea, how did you approach the developing process, how did the code camp method work for you?) 
 +      * Conclusion (consider where your project could head next, what kind of use and features would the fully completed app have?
 +    * One page poster about your project (see examples from previous years, also upload to wiki)
     * Email has to have topic [CC2013] Group X (for example: [CC2013] Group 2)     * Email has to have topic [CC2013] Group X (for example: [CC2013] Group 2)
       * Include project source code (remove binaries in bin and opt!) and the project report document in the email       * Include project source code (remove binaries in bin and opt!) and the project report document in the email
-      * Don't upload project source to the wiki, only the report and binaries +      * Don't upload project source to the wiki, only the report, poster and binaries 
-        * Upload your app to the store for extra points and just link to your app+        * Considering uploading your app to the store for extra points and include a link to your app
       * Include link to your wiki page in the email       * Include link to your wiki page in the email
-    Finally upload the poster to the wiki page +  **On Monday 11.2.** 
-  * Before March 1st sign up your team in one major Imagine Cup category (or the Windows Phone Challenge) +    * Come to your reserved feedback time slot, which can be reserved here:  [[http://www.doodle.com/tk8kchqsg65pb79v]] (Meeting room 2512, 12:30 - 16:00) 
-    * See the details and links: TBA+  * **Before March 1st, consider signing up your team** in one major Imagine Cup category (or the Windows Phone Challenge) 
 +    * See the details and links: [[http://www.imaginecup.com/]]
  
 \\ \\
-\\ 
- 
-The feedback day for the reports will be announced on week 5. Attending the feedback day and presenting your report is mandatory. 
- 
  
 +The feedback day for the reports will be on the Monday 11.2. in the afternoon. Attending the feedback day and giving a verbal report is mandatory. Reserve a time for your group at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Imagine Cup ====== ====== Imagine Cup ======
   * [[http://imaginecup.com|Imagine Cup Home]]   * [[http://imaginecup.com|Imagine Cup Home]]