meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dotnet2013:start [2013/01/27 22:09]
aknutas [Requirements for projects]
dotnet2013:start [2013/02/06 13:53] (current)
aknutas [News & Notes]
Line 3: Line 3:
  
 ====== .NET Code Camp 2013 ====== ====== .NET Code Camp 2013 ======
-//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2011  Room no: 6218//+//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2013  Room no: 6218//
  
 CT30A9300 Code Camp on Communications Engineering (4 cr) CT30A9300 Code Camp on Communications Engineering (4 cr)
Line 11: Line 11:
   * Friday tutorial material {{:dotnet2013:dotnet_web_tutorials.zip|HERE}}   * Friday tutorial material {{:dotnet2013:dotnet_web_tutorials.zip|HERE}}
   * Please give course feedback: [[http://www.webropolsurveys.com/S/055CEEDF4AB021B4.par|Course Feedback, pt1]]   * Please give course feedback: [[http://www.webropolsurveys.com/S/055CEEDF4AB021B4.par|Course Feedback, pt1]]
 +  * **Return requirements relating to the report have been updated.** The deadline has been extended from Friday 1.2. to Sunday 3.2. See more details below.
 +  * Time reservation for group feedback on Monday 11.2. is available. Participation is mandatory. Prepare to present a verbal report of your work and discuss details of your project. Maximum time available is 30 minutes. Please reserve only one time per group. Time reservation is available at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Code Camp Week ====== ====== Code Camp Week ======
 **Location** **6218** basement computer lab **Location** **6218** basement computer lab
-  * **Start time on Monday 23.1.2011 at 9:10**+  * **Start time on Monday 23.1.2013 at 9:10**
 \\ \\
 ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^ ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^
Line 52: Line 54:
 \\ \\
 \\ \\
-**Return requirements for groups and the return schedule** +==== Return requirements for groups and the return schedule ==== 
-  * O**Friday, at the end of the course, you need to have**+  * **On Friday, at the end of the course, you need to have**
     * Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.)     * Five minute presentation about your program (idea, motivation, goals, technology used, what was actually implemented etc.)
     * Five minute demonstration of your //working// program     * Five minute demonstration of your //working// program
Line 65: Line 67:
       * Some explanatory charts optionally       * Some explanatory charts optionally
       * Your project source binaries as wiki, no need to upload source code       * Your project source binaries as wiki, no need to upload source code
-  * **In a week (before 23:59 4.2.2012)** send an email to Antti Knutas ( firstname.lastname@lut.fi ) with:+  * **In a week (before 23:59 3.2.2012)** send an email to Antti Knutas ( firstname.lastname@lut.fi )with:
     * Six page report of your project (also upload to wiki), including:     * Six page report of your project (also upload to wiki), including:
       * Project introduction, motivation (justify the need for your app!)       * Project introduction, motivation (justify the need for your app!)
Line 78: Line 80:
         * Considering uploading your app to the store for extra points and include a link to your app         * Considering uploading your app to the store for extra points and include a link to your app
       * Include link to your wiki page in the email       * Include link to your wiki page in the email
-  * **On Thursday 7.2.** +  * **On Monday 11.2.** 
-  * Before March 1st consider signing up your team in one major Imagine Cup category (or the Windows Phone Challenge)+    * Come to your reserved feedback time slot, which can be reserved here:  [[http://www.doodle.com/tk8kchqsg65pb79v]] (Meeting room 2512, 12:30 - 16:00) 
 +  * **Before March 1stconsider signing up your team** in one major Imagine Cup category (or the Windows Phone Challenge)
     * See the details and links: [[http://www.imaginecup.com/]]     * See the details and links: [[http://www.imaginecup.com/]]
  
 \\ \\
  
-The feedback day for the reports will be on the Thursday 7.2. in the afternoon. Attending the feedback day and also giving a verbal report is mandatory. Time reservation link will be announced. +The feedback day for the reports will be on the Monday 11.2. in the afternoon. Attending the feedback day and giving a verbal report is mandatory. Reserve a time for your group at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Imagine Cup ====== ====== Imagine Cup ======
   * [[http://imaginecup.com|Imagine Cup Home]]   * [[http://imaginecup.com|Imagine Cup Home]]