meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
dotnet2013:start [2013/01/31 10:10]
aknutas [Return requirements for groups and the return schedule]
dotnet2013:start [2013/02/06 13:53] (current)
aknutas [News & Notes]
Line 3: Line 3:
  
 ====== .NET Code Camp 2013 ====== ====== .NET Code Camp 2013 ======
-//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2011  Room no: 6218//+//Code Camp Week: Week 4 Monday 21.1 - Friday 25.1 2013  Room no: 6218//
  
 CT30A9300 Code Camp on Communications Engineering (4 cr) CT30A9300 Code Camp on Communications Engineering (4 cr)
Line 12: Line 12:
   * Please give course feedback: [[http://www.webropolsurveys.com/S/055CEEDF4AB021B4.par|Course Feedback, pt1]]   * Please give course feedback: [[http://www.webropolsurveys.com/S/055CEEDF4AB021B4.par|Course Feedback, pt1]]
   * **Return requirements relating to the report have been updated.** The deadline has been extended from Friday 1.2. to Sunday 3.2. See more details below.   * **Return requirements relating to the report have been updated.** The deadline has been extended from Friday 1.2. to Sunday 3.2. See more details below.
 +  * Time reservation for group feedback on Monday 11.2. is available. Participation is mandatory. Prepare to present a verbal report of your work and discuss details of your project. Maximum time available is 30 minutes. Please reserve only one time per group. Time reservation is available at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Code Camp Week ====== ====== Code Camp Week ======
 **Location** **6218** basement computer lab **Location** **6218** basement computer lab
-  * **Start time on Monday 23.1.2011 at 9:10**+  * **Start time on Monday 23.1.2013 at 9:10**
 \\ \\
 ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^ ^        Monday                ^ Tuesday      ^  Wednesday    Thursday            Friday    ^
Line 80: Line 81:
       * Include link to your wiki page in the email       * Include link to your wiki page in the email
   * **On Monday 11.2.**   * **On Monday 11.2.**
-    * Come to your reserved feedback time slot, which will be available in the afternoon+    * Come to your reserved feedback time slot, which can be reserved here:  [[http://www.doodle.com/tk8kchqsg65pb79v]] (Meeting room 2512, 12:30 - 16:00)
   * **Before March 1st, consider signing up your team** in one major Imagine Cup category (or the Windows Phone Challenge)   * **Before March 1st, consider signing up your team** in one major Imagine Cup category (or the Windows Phone Challenge)
     * See the details and links: [[http://www.imaginecup.com/]]     * See the details and links: [[http://www.imaginecup.com/]]
Line 86: Line 87:
 \\ \\
  
-The feedback day for the reports will be on the Thursday 7.2. in the afternoon. Attending the feedback day and also giving a verbal report is mandatory. Time reservation link will be announced. +The feedback day for the reports will be on the Monday 11.2. in the afternoon. Attending the feedback day and giving a verbal report is mandatory. Reserve a time for your group at: [[http://www.doodle.com/tk8kchqsg65pb79v]]
 ====== Imagine Cup ====== ====== Imagine Cup ======
   * [[http://imaginecup.com|Imagine Cup Home]]   * [[http://imaginecup.com|Imagine Cup Home]]